Determine the outside dimensions and the swing requirements of cabinet doors. Once you have the panel designed, you must figure out where to put it. Have the supplier engineer the panel once rather than redoing it in the field while under pressure from management to “get this thing going.” If your panel is moderately complex, then you may have the option of “supplier engineering.” Don't try to save money by not purchasing this. This collaboration can produce significant savings in cost and delivery. Work with your electrical distributor to see what standard offerings are closest to what you need. Rather than ensure the need for extension cords, add sufficient receptacles at convenient locations, and allow for these in your rough layout. Allow for enough space to install and wire these items with proper routing and bend radii.Īn overlooked issue with larger control panels is the need to power test equipment and appliances, such as vacuums used for maintenance. To determine the enclosure size, rough out its back planes, termination strips, and major component locations. Using Table 110.20, select the type of enclosure based on the intended environment. ![]() Let's take a look at some specific guidelines. So make sure to build that compliance into your design and installation specs. When industrial controls exhibit intermittent operation, a common cause is non-compliance with Art. Two that always apply are UL 508A, “Standard for Industrial Control Panels, and NFPA 79, “Electrical Standard for Industrial Machinery.” NECA, NETA, and IEEE also have produced applicable standards for design, installation, testing, and/or maintenance. Standards other than the NEC also apply to industrial control panels. 409 violation, unless the problem is of the “where's that smoke coming from?” variety. When there's a controls malfunction, the cause is unlikely to be an Art. 409 aren't optimal ( What Purpose Does it Serve?). ![]() The NEC is primarily concerned with the hazards arising from the use of electricity, not the myriad of other issues that arise with industrial control panels. However, Table 409.3 lists more than two dozen other Articles that may apply to a given control panel, which definitely broadens its scope. Because this section of the Code is only a couple of pages long, it isn't that comprehensive. ![]() folder contains project code written in keil ide.Article 409 provides the minimum safety requirements for industrial control panels ( What's an Industrial Control Panel? below). Please give us your feed back on the project. To make it more efficient you can include lift stop and start function using interrupts. With lift/elevator each floor moving up or down the corresponding led bar will increment or decrements.Ĭode of elevator control system is open source you can modify and redistribute it. When elevator/lift is moving downwards an arrow pointing downwards will appear on 16×2 lcd screen representing lift is moving downwards. When life/elevator is moving upwards an arrow pointing upward will display on 16×2 lcd representing that elevator is moving upwards. At the end of this message text floor numbers on which lcd is approaching will be displayed. G-UP means going upwards and G-DOWN means going downwards. Lift/Elevator starts moving in the floor direction and 16×2 lcd will display message G-UP or G-Down. Select your elevator floor by pressing its corresponding push button. When you power the circuit a message will pop up on the 16×2 lcd row 1. Power the circuit after successful hardware connections and code download in microcontroller completion. Just make the above circuit and download the code in 8051 microcontroller. How to send command and data to 16×2 lcd?. ![]() I recommend you to please go through the tutorials below before moving to the project code. If you don’t know how to use 16×2 lcd and how 7 segment display led bar works. Void display() Sending Data to be displayed on 16×2 lcd Void lcdcmd() Sending Commands to 16×2 lcd Void Timedelay() Generating a time delay of some seconds to be used where necessary Void delay() Generating a time delay of some microseconds to be used where necessary Void DownFloor() Moving the Elevator Downwards Led bar moves upwards when elevator is moving upwards and Led bar moves down wards when elevator is approaching ground floor.ĭescription of the Functions present in the Code The status of elevator on reaching and crossing each floor is displayed on 16×2 lcd also it can also be visualized on the led bar. Floor() function moves the Lift up wards and after reaching the desired floor it calls the DownFloor() function which moves the lift back to the ground floor. If any then it calls the Floor() function. void main() function is checking if any key is pressed by the user. Their are two main functions Floor() and DownFloor(). Coming to the code portion of elevator control system.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |